Mission Fill The Lake (MFTL)
Mission Fill The Lake (MFTL)

Project Name: Mission Fill The Lake (MFTL)
Client: Saudi-Elaf
Location: Trojena, Neom, KSA
Year: 2026-ongoing
Project Scope: The H₂ Tube Trailer Filling Station will become the first hydrogen refueling facility in OXAGON, establishing the foundational infrastructure needed to support NEOM’s transition toward a fully integrated
Enersys Scope:
- Providing design and shop drawings for Wet and dry utilities as per Neom procedure
- Design Security Systems as per HCIS standards
- Owner consultant representative in supervising all site MEP works.

