Instrumentation and Control Package of Vertical Farm Infrastructure

Instrumentation and Control Package of Vertical Farm Infrastructure

Client: Saudi Elaf
Location: Neom, KSA
Year: 2026-Ongoing

  • The project scope includes Design, Engineering, Procurement, Installation and Testing and Commissioning of the Instrumentation and Control System of the Vertical Farm Infrastructure Project.
  • The Design included the P&IDs, IO point schedules, Instrument and panel list for the PLC based control system for the Irrigation tanks and pump room, Combined fire and potable water tanks and pumps, Sewage Tank area including the submersible pumps.