The Village Mall
The Village Mall

Client Name – The Village mall
Value – Confidential
Year: 2024
Location: Oman
Scope Summary – Reassess and recalculate the outdoor cooling requirements of the entire outdoor area of the outdoor mall through thermal modelling and align them with the operator’s chiller plant capacity to ensure adequate service coverage. Develop a thermal storage strategy to minimize electrical demand by charging the storage system during nighttime hours—when ambient temperatures are lower—and discharging it during daytime peak periods and humid summer evenings. The analysis also considers cost savings associated with adopting a variable electricity tariff structure offered by the utility provider, maximizing chiller operation during periods of lowest energy rates.

